DoubleTree Tower of London

Image of a newly refurbished guest bedroom taken from the doorway. There’s a full height window behind a burnt orange sofa and white coffee table. The bed has crisp white bedding and scalloped headboard in front of luxurious panels. There’s a wooden shelving unit in the corner of the room.

We’re proud to announce the successful completion of all seven phases of the guest room refurbishment at the DoubleTree by Hilton London – Tower of London.

A hotel bedroom with modern brown panelling on the walls, an open hanging rail and bed with white linen in the foreground

As the appointed Project Management team, we’ve overseen the transformation of 201 bedrooms, delivering a modern, refreshed experience for guests while ensuring the hotel remained fully operational throughout.

Image taken from the foot of the bed which is dressed in crisp white linen. There’s luxurious panelling behind a scalloped headboard and bedside lights fitted to the panelled wall.

Nidhi Badrakia, Project Manager, said: “We’re delighted with the finished results – the guest bedrooms across three floors have been elevated and now offer guests a modern and contemporary space to stay. A huge thank you to the entire project team for their meticulous planning and collaboration throughout the works.”

Picture taken peeking through to the new guest bedroom. The bed has crisp white bedding and scalloped headboard in front of luxurious panels. There’s a wooden shelving unit in the corner of the room.

We’ve been delighted to work alongside Medlock FRB (Contractors), Forest Contracts Ltd (Joinery), Virtus Consult (Quantity Surveyor) and Upperworth Studios (Interior Design).

A huge well done to everyone involved in delivering this successful refurbishment.

Back to top