It was an honour to be part of the St. Regis London, The Westbury bottoming out ceremony led by Sir Robert McAlpine (Contractors) last month.
The hotel is undergoing a major refurbishment and extension, led by Morrison Design who are the appointed architects and project managers. The 15,217m2 project will add a second level basement floor and house 196 rooms including several luxury suites, an elegant presidential suite and the redefined Polo Bar.
“It’s a long and challenging project for all the team, yet their dedication and motivation is inspirational. It’s milestones such as this where we pause and reflect on how far we’ve come. Well done to the project team at Morrison Design – James, Cerys, Liam, Les, Dean and everyone else who’s helped out along the way so far.”
Peter Newman-Earp, Director at Morrison Design
Morrison Design are working with Ramboll (structural engineers), Furness Green Partnership Ltd (mechanical and electrical engineers), Virtus Consult (quantity surveyors), Realtime Civil Engineering Ltd, and Richmond International (interior designers).