The Purcell School of Music

Bushey, Hertfordshire

  • Client: -
  • Year Completed: 2011
  • Approx Value: £4 Million

Located on the very edge of the greenbelt, this development to provide modern boarding facilities for up to 80 students at this part-residential specialist music school the represents first stage in a multi-phased redevelopment of the existing campus.

The accommodation is spread over five floors, arranged in two separate single-sex “houses” and planned to maximise flexibility to allow for fluctuating student numbers. Student bedrooms are located on the middle three floors with communal facilities and two deputy-housemasters’ flats at ground level, and two housemasters’ flats on the fourth floor. Originally appointed to provide architectural services to design and build contractor Bowmer & Kirkland (London) Ltd, Morrison Design Ltd’s role has subsequently expanded to prepare a revised development masterplan for the School.

Share this Project

© Morrison Design Limited 2018. Registered in England No.2044929. VAT Registration No. 439 3733 29