The works were structured in a complex phased operation to maintain existing teaching during construction work. A range of sustainable design solutions forms part of the design including high levels of daylight, solar shading, passive ventilation and rainwater harvesting to provide environmentally friendly teaching spaces and to minimise annual running costs.